Relocation and Secondary Installation of Graphitization Furnace: Precautions and Acceptance Standards

return Source:YuanHang
Relocation and Secondary Installation of Graphitization Furnace: Precautions and Acceptance Standards
Glance over:- Release date:May 20, 2026【Big In Small
=IFERROR(@__xludf.DUMMYFUNCTION("GOOGLETRANSLATE(G56, ""zh"", ""en"")"),"

Graphitization Furnace Relocation and Secondary Installation: Precautio"&"ns and Acceptance Standards

When a factory expands, relocates, or adjusts its production line, the graphitization furnace needs to be moved. This is not a simple matter of ""disassembling and reinstalling""; there are many precautions to take.

Preparation Before Relocation

  • Photo Recording: Take photos of all pipeline connections, electrical wiring, and equipment layout for comprehensive documentation.
  • Labeling"&": Mark each water pipe, gas pipe, and cable, indicating its destination.
  • Protecting Precision Components: Pack precision equipment such as vacuum pumps, power cabinets, and control cabinets separately and protect them f"&"rom shock.
  • Draining Liquids: Completely drain cooling water and vacuum pump oil.

Relocation Process
  • Professional Lifting: The graphitization furnace body is heavy and has a precise s"&"tructure, requiring operation by a professional lifting company.
  • Shockproof Transportation: Shockproof securing measures are taken during transportation, especially for precision instruments.
  • Dedicated Personne"&"l Accompanying the Vehicle: Technical personnel are assigned to accompany the precision equipment on-site to handle any emergencies.

Post-reinstallation acceptance testing is required after relocation. **Complete acceptance t"&"esting must be performed again after relocation:** **Mechanical Inspection:** All connections are secure, valves are flexible, and the furnace door is sealed. **Electrical Inspection:** Insulation resistance test, grounding resistance test, wiring ver"&"ification. **Water Cooling System Inspection:** Water pressure test, flow rate check for each circuit. **Pressure Rise Rate Test:** Verify the integrity of the seal (the sealing ring may have shifted after relocation). **Temperature Uniformity Test:"&"** Retest the temperature field using a ceramic temperature measuring ring. **No-load Furnace Trial Run:** Heat to operating temperature and observe various indicators. **Olive** **Background:** **Padding:** **15px;border-left:** **4px solid** #c"&"0392b"">Absolutely NOT:Putting the equipment into production immediately after relocation! A customer once started production without conducting a pressure rise rate test after relocation, resulting in a misaligned seal causing a leak, an"&"d the entire batch of high-purity product was oxidized and scrapped. Every single acceptance test after relocation is essential and cannot be omitted.


")